TY - JOUR
T1 - A General Peak Current Limiting Strategy for Start-up and Fault-Ride-Through in Dual Active Bridge Converters
AU - Mao, Tianhao
AU - Guo, Zhiqiang
AU - Zou, Suli
AU - Cao, Guoen
N1 - Publisher Copyright:
© 2013 IEEE.
PY - 2026/4/1
Y1 - 2026/4/1
N2 - This article presents a general peak-current limiting strategy for dual active bridge (DAB) converters under triple phase shift (TPS) control, which can achieve both fault-ride-Through (FRT) capability and soft start. DAB converters often encounter overcurrent conditions during start-up, overload, or short circuit. The proposed method addresses these challenges by integrating peak current limitation directly into TPS control, without adding additional control complexity. This strategy allows the maximum phase shift angle to be constrained according to a predefined peak current threshold, thereby limiting the peak current. This constraint improves the fault tolerance of the converter and enhances system stability. Analytical derivations of the peak current limiting strategy are provided, and numerical analysis is conducted to verify its accuracy. Experimental results verify the effectiveness of the proposed strategy under both start-up and overload. The strategy offers a simple and effective solution to protect the DAB converter from overcurrent.
AB - This article presents a general peak-current limiting strategy for dual active bridge (DAB) converters under triple phase shift (TPS) control, which can achieve both fault-ride-Through (FRT) capability and soft start. DAB converters often encounter overcurrent conditions during start-up, overload, or short circuit. The proposed method addresses these challenges by integrating peak current limitation directly into TPS control, without adding additional control complexity. This strategy allows the maximum phase shift angle to be constrained according to a predefined peak current threshold, thereby limiting the peak current. This constraint improves the fault tolerance of the converter and enhances system stability. Analytical derivations of the peak current limiting strategy are provided, and numerical analysis is conducted to verify its accuracy. Experimental results verify the effectiveness of the proposed strategy under both start-up and overload. The strategy offers a simple and effective solution to protect the DAB converter from overcurrent.
KW - Dual active bridge (DAB) converters
KW - fault-ride-Through (FRT)
KW - peak current limit
KW - soft start
KW - triple phase shift (TPS) control
UR - https://www.scopus.com/pages/publications/105019616986
U2 - 10.1109/JESTPE.2025.3620775
DO - 10.1109/JESTPE.2025.3620775
M3 - Article
AN - SCOPUS:105019616986
SN - 2168-6777
VL - 14
SP - 2142
EP - 2155
JO - IEEE Journal of Emerging and Selected Topics in Power Electronics
JF - IEEE Journal of Emerging and Selected Topics in Power Electronics
IS - 2
ER -