跳到主要导航 跳到搜索 跳到主要内容

A General Peak Current Limiting Strategy for Start-up and Fault-Ride-Through in Dual Active Bridge Converters

  • Beijing Institute of Technology
  • North China University of Technology

科研成果: 期刊稿件 › 文章 › 同行评审

摘要

This article presents a general peak-current limiting strategy for dual active bridge (DAB) converters under triple phase shift (TPS) control, which can achieve both fault-ride-Through (FRT) capability and soft start. DAB converters often encounter overcurrent conditions during start-up, overload, or short circuit. The proposed method addresses these challenges by integrating peak current limitation directly into TPS control, without adding additional control complexity. This strategy allows the maximum phase shift angle to be constrained according to a predefined peak current threshold, thereby limiting the peak current. This constraint improves the fault tolerance of the converter and enhances system stability. Analytical derivations of the peak current limiting strategy are provided, and numerical analysis is conducted to verify its accuracy. Experimental results verify the effectiveness of the proposed strategy under both start-up and overload. The strategy offers a simple and effective solution to protect the DAB converter from overcurrent.

源语言英语
页(从-至)2142-2155
页数14
期刊IEEE Journal of Emerging and Selected Topics in Power Electronics
卷14
期2
DOI
出版状态已出版 - 1 4月 2026
已对外发布是

学术指纹

探究 'A General Peak Current Limiting Strategy for Start-up and Fault-Ride-Through in Dual Active Bridge Converters' 的科研主题。它们共同构成独一无二的学术指纹。

引用此

Baidu
map